Project Description
Midwest Construction removed the existing deck and hauled it away on this 1977 home. Next step, install the helical piers/footings to support the Insul-Deck, sunroom walls and roof system. Sunroom walls were installed; door set and the insulated roof sections were installed. Azek Composite Decking with Westbury Aluminum Railing were used to add the finishing touches. The electrician was be called as soon as the walls were set and scheduled to install the wiring, switches and ceiling fan. Midwest Construction cleaned up all construction debris dally, all tools secured and the reaming debris was hauled away.